Steel I-beams are custom welded to floor plan specifications in Champion's frame jig. In HUD Code homes the frame is an integral part of the floor system.
|
Sub-floors are built in a jig to insure accuracy and squareness. Champion's floors are all number 2 grade lumber.
|
The frame and sub-floor are then lagged together. Creating an intergrated floor system.
|
|
The floor system is then turned right side up. The process continues with the installation of kitchen and bath fixtures by Champion's skilled plumbers.
|
Interior walls are installed to floor plan specifications, creating the proper interior room dimensions.
Note the 2 x 6 exterior walls, found in most of Champion's units.
|
Exterior marriage walls are then installed, completing the framing process.
|
|
As the walls are being installed, the ceiling is being produced off line. This allows ample drying time for the finish of the ceiling.
|
The ceiling is then positioned on to the unit and attached.
|
At the next station dual glazed windows and the steel door are installed.
|
|
As the walls are being installed, the ceiling is being produced off line. This allows ample drying time for the finish of the ceiling.
|
Vinyl siding is then applied to the home.
|
All homes receive a shingled roof.
|
|
All cabinets are built in Champion's own cabinet shop by skilled cabinet makers, to exacting specifications.
|
The cabinets and moldings are installed by Champion's finish carpenters.
|
Drywall being finished and painted.
|
|
Carpet is then installed by Champion's experienced carpet layers.
|
The homes are thoroughly cleaned through out.
|
All the homes are inspected numerous times prior to shipping.
|